files: 95
This data as json
rowid | image | timestamp | memento | first_capture | last_capture | current_status | text | mime | status | url | urlkey | digest | length | file_path |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
95 | 20060913170056 | https://web.archive.org/web/20060913170056/http://www.defence.gov.au/dmo/id/defence_industry_2006/20june/LTGEN_Hurley.ppt | 2006-09-13 | 2006-09-13 | 500 | 1 Defence Capability Plan 2006-16 Lieutenant General David Hurley D&I Conference 2006 2 Scope Introduction DCP 2004-14 Achievements DCP 2006-16 3 Defence Capability Plan Development plan for Australia's military capabilities Rolling 10 year focus Updated annually as part of the budget process Public version is released regularly to inform industry of Defence’s capability needs 4 Public DCP 2004-14 Released in February 2004 57 Government approvals to date 15 Approvals pre Kinnaird 13 Approvals during Transition period 29 First and Second Pass Approval $11.3 bn total value Achievement of over 80% of the planned approvals at either 1st or 2nd pass until 2006-07. 5 Post Kinnaird Approvals 14 Second Pass Approvals including: Follow on Stand off weapon for FA-18 Airborne Surveillance for Land Operations ANZAC ASMD Upgrade – Fire Control Radar Heavy Airlift AWD – Long Lead Items 6 Post Kinnaird Approvals 14 Second Pass Approvals including: Follow on Stand off weapon for FA-18 Airborne Surveillance for Land Operations ANZAC ASMD Upgrade – Fire Control Radar Heavy Airlift AWD – Long Lead Items 7 Post Kinnaird Approvals 14 Second Pass Approvals including: Follow on Stand off weapon for FA-18 Airborne Surveillance for Land Operations ANZAC ASMD Upgrade – Fire Control Radar Heavy Airlift AWD – Long Lead Items 8 Post Kinnaird Approvals 14 Second Pass Approvals including: Follow on Stand off weapon for FA-18 Airborne Surveillance for Land Operations ANZAC ASMD Upgrade – Fire Control Radar Heavy Airlift AWD – Long Lead Items 9 15 First Pass Approvals including: Air Warfare Destroyer Amphibious Deployment and Sustainment Follow on Standoff Weapon Capability (also received 2nd Pass) Improved Logistics Information System Overlander – Field Vehicles and Trailers Soldier Enhancement Version 2 Post Kinnaird Approvals 10 DCP 2006-16 Highlights Financial Aspects Key projects Changes since DCP 2004-14 Delivering the DCP Implementation of Kinnaird 11 DCP 2006-16 Financial Aspects Funding Continuation of 3% funding growth beyond 2010/11 adds over $2 billion up to 2015/16 $625 million reprogrammed into Forward Estimates period 12 DCP 2006-16 Financial Aspects Costs DCP 2006-16 total cost over $51 billion $31 billion to be spent on next 10 years on DCP projects together with approved projects around $45 billion to be spend on Defence capabilities over the next decade 13 Cumulative DCP Funding 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 1 2 3 4 5 6 7 8 9 10 DCP Year Cumulative DCP Funding ($ billion) 2004-14 DCP 2006-16 DCP Total Major Capital Equipment 2004-14 Total Major Capital Equipment 2006-16 14 Key DCP 2006-16 Projects Joint Strike Fighter $12bn + Air Warfare Destroyer $4.5bn + Helicopters $3.7bn + Maritime Patrol Aircraft $3.5bn + Overlander $2.5bn + Amphibious Ships $1.7bn + Multi-mission UAV $1bn + Military Satellite Capability $1bn + 15 Key Changes since DCP 2004-14 Changes include rolling the DCP on out to 2015/16, new projects, increased project provisions, reductions/deletions, and timing changes. 16 New Projects in DCP 2006-16 24 new Projects/Phases worth $7.4 billion including: Naval Combat Helicopters $2.5bn + Ground Based Air Defence $750m + Hawk Mid Life Upgrade $350m + Logistics Management System $350m + ANZAC Enhancement $350m + 17 Cost Increases to Existing Projects 17 cost band increases including: Satellite Communications now $1000m to $1500m Multi-Mission UAV now $1000m to $1500m C-130H Replacement now $750m to $1000m Hornet Refurbishment now $600m to $750m ADF JCS Environment now $250m to $350m Logistics Info Systems now $150m to $200m 18 Reductions/Deletions 3 deleted projects worth less than $100m; 5 cost band reductions including: Surveillance Enhancement now $250m to $350m Seahawk Mid-life Upgrade now $350m to $450m Artillery Replacement now $450m to $600m 19 Delivering the DCP Implementation of Kinnaird Significant preparatory work between 1st and 2nd pass on average 22 months between 1st to 2nd pass average 6% of total project funds spent before 2nd pass Plus total annual funding of up to $66 million for: Project Development Funds, Capability Technology Demonstrators, and Rapid Prototyping Development and Evaluation. 20 Initiatives in FY 06/07 New ‘Entry into DCP’ step Formation of a Defence T&E Office Re-orientation of Australian defence Simulation Office Test the ‘one size fits all’ approach with Central Agencies NCW Assessment and Compliance Gateways 2 1 CONCLUSION | application/vnd.ms-powerpoint | 200 | http://www.defence.gov.au/dmo/id/defence_industry_2006/20june/LTGEN_Hurley.ppt | au,gov,defence)/dmo/id/defence_industry_2006/20june/ltgen_hurley.ppt | JARPXQCNYD63OKKKQSIBASFZNN2RLNE5 | 1677619 | domains/defence-gov-au/powerpoints/original/au-gov-defence-dmo-id-defence-industry-2006-20june-ltgen-hurley-ppt-20060913170056.ppt |