files: 53
This data as json
rowid | image | timestamp | memento | first_capture | last_capture | current_status | text | mime | status | url | urlkey | digest | length | file_path |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
53 | 20070908091325 | https://web.archive.org/web/20070908091325/http://www.defence.gov.au/capability/common/docs/DLCD_Status_Report_LEWG_Jun_06_Master.ppt | 2007-09-08 | 2007-09-08 | 404 | Land Development Branch Major Projects Land Combat Development Lieutenant Colonel Tim Griggs 1 Land Development Branch Scope • General update on Unapproved Projects • Cost, Schedule and Scope (in accordance with DCP 06-16) • Projects approaching RFT • Defence priorities and concerns • Opportunities for Australian Industry Land Development Branch Directorate of Land Combat Development 3 COL Tony Luke DLCD (02) 626 53985 Special Ops MAJ Colin Blyth (02) 626 DD Combat LTCOL Bernie Richards DD Close Combat LTCOL John Baird DD Combat Spt LTCOL Tim Griggs DD Integration LTCOL Martin Griffiths LAND 106 LAND 112-4 LAND 116-3 LAND 907 LAND 400-1 LAND 40-2 LAND 53-1BR LAND 91-6 LAND 125-3 / 4 LAND 132 JP 141 / 2087 JP 199 JP 2042-3 JP 2088 LAND 17 LAND 58-3 LAND 19-6 LAND 19-7 LAND 53-1E LAND 146-1 LAND 146-2 LAND 75 JP 2097 SF ADRHIB LAND 53-1F LAND 53-2B JP 2072 Land Development Branch Close Combat Section LTCOL John Baird Deputy Director Close Combat LAND 40 Ph 2 Direct Fire Support Weapon LAND 53 Ph 1BR Project NINOX Night Fighting Equipment Replacement LAND 91 Ph 6 Life of Type Extension F88 Steyr LAND 125 Ph 3 Soldier Combat System Land Development Branch LAND 40 Ph 2 Direct Fire Support Weapon 5 • Project Aim - Seeks to provide a range of direct fire support weapons for use by ARA infantry battalions. • Project Status: Pre 1st Pass • YOD: 07/08 • ISD: 08 - 10 • DCP guidance: $150 - 200m • Issues for Industry: – RFT release for DFSW and 84mm (M3) SRAAW Night Sight released early 07. – Competitive evaluation of weapons; e.g, 25mm cannons, 40mm AGLs. – Seeking ‘smart’ ammunition, eg. airburst, enhanced blast, fire control systems. – Seeking vehicle mounting options e.g, RWS, soft and flexible mounts. • Contact: MAJ Lachlan Mercer (+61 2 6265 4349) 0m 400m 800m 1200m 1600m 2200m 2600m 3000m 3400m 3800m Small arms, 5.56mm / 40mm GLA MDFSW, 84mm SFMG, 7.62mm CAPABILITY GAP 1100m - 2000m range DFGW, Land 40 Phase 1 INFANTRY BATTALION DIRECT FIRE WEAPONS RANGES Land Development Branch LAND 53 Ph 1B/R - Project NINOX Night Fighting Equipment Replacement • Project Aim: Seeks to replace/refurbish existing night fighting equipment systems. • Project Status: Pre 1st Pass (Project Definition Stage) • YOD: 2008/09 to 2010/11 • ISD: 2010-2012 • DCP Guidance: $150m - $250m • Issues for Industry: – Technology maturity • Innovations in Image Intensification (FOV; resolution; weight; power) • Short Wave IR and Long Wave IR solutions entering the marketplace • Uncooled TI performance (weight; range; resolution; power) • Fused technology options (TRLs in project timeframe; costs; reliability; weight; power). – Human factors • integration; useability (particularly weight and dimensions); impact on the soldier. – Comparison Trial early/mid 2008 • Contact: LTCOL John Baird (+61 2 6265 1554) Land Development Branch LAND 91 Ph 6 Life of Type Extension F88 Steyr 7 • Project Aim: To extend the life of ADF small arms, such as the F88 Steyr and F89 Minimi. Previous phases of LAND 91 introduced the F88 into service in 1988 and the F89 in 1989. • Project Status: Pre 1st Pass • YOD: 08/09 - 10/11 • ISD: 2010-12 • DCP guidance: $30 - 50m • Issues for Industry: – Integration with Fire Control Systems – Integration with LAND 125 – Partial upgrade of entire fleet (12 -14K of 72K). – Employment of non-lethal and less-than-lethal force weapons and ammunition. • Contact: MAJ Lachlan Mercer (+61 2 6265 4349) Land Development Branch L125 Ph 3 Soldier Combat System 8 • Project Aim - Land 125 seeks to optimise the performance of the ADF’s close combat force through the selective application of leading edge technologies. • Project Status: Pre 2nd Pass • Project Deliverables: – Phase 2A Project Definition Study - Complete – Phase 2 B ISD 05/06. Soldier Enhancement Version 1. – Phase 3 ISD 07/09. Soldier Enhancement Version 2. – Phase 4 ISD 10/12. Soldier Enhancement Version 3. • Phase 3 YOD: 06/07 • Phase 3 DCP guidance: $450 - 600m • Issues for Industry: – Combined Land 125 and Land 75 RFT Release for BMS-M and BMS-D. – ADF seeking primes for sub-systems where feasible. – S&T plan seeking industry engagement for Phase 4 and beyond, DSTO to lead. Contact: CAPT Adam Rankin (+61 2 6265 2810) Land Development Branch Combat Support Section LTCOL Tim Griggs - Deputy Director Land 17 Artillery Replacement Project Land 58 Ph 3 Weapon Locating Radar LOTE Land 19 Ph 7 RBS-70 Enhancement/Replacement 9 Land Development Branch LAND 17 - Artillery Replacement Project 10 • Project Aim: To modernise the Army’s fire support system through the acquisition of a networked Battle Management System – Fires (BMS-F), Artillery PGM and replacement of the Hamel Gun and M198 Howitzer fleet. • New howitzer fleet based on ARA requirement for 6 batteries: – Not less than 2 batteries of protected SP, and – Not more than 4 batteries of Lightweight Howitzer. • Cost: $450-600m • Schedule: – YOD: 08/09 – ISD: 2011 • Issues for Industry: – RFT release 4Q 2006 • Contact: MAJ Mat Taylor (+61 26265 1734) Land Development Branch LAND 58 Ph 3 Weapon Locating Radar LOTE 11 • Project Aim: To extend the Life of Type of the ADF AN/TPQ-36 Weapon Locating Radar until 2015. • Tender Evaluation Complete • Capability Proposal Second Pass and Acquisition Business Case are under consideration. • Pending DCC endorsement, Second Pass Approval from Government in 2006 • Issues for Industry: – Post 2015 … Land 58-4 ? • Contact: MAJ Paul Randall (+61 26265 4441) Land Development Branch LAND 19 Ph 7 RBS70 Replacement/Enhancement 12 • Project Aim: To enhance or replace the existing GBAD system. It may include new technologies and weapon systems that are also capable of countering Rockets, Artillery, Mortars and Missiles (CRAMM). • Project Status: Pre 1st Pass (Project Definition Phase) • YOD: 2015/16 – 2017/18 • ISD: 2018/2020 • DCP Guidance: $750 – 1000m • Issues for Industry: – JAMD Study strongly supports scope of LAND 19 Ph 7 – RBS70 LOT is 2015 – CRAMM could be cannon, Directed Energy Weapons etc – Countering threat force air-delivered stand-off hyper-sonic munitions ? – Sensor data fusion between GBAD and STA sensors – Collaborative Engagement Capability ? – Surface launched missiles • Contact: MAJ Paul Randall (+61 26265 4441) Land Development Branch Combat Section LTCOL Bernard Richards Deputy Director Combat LAND 112 Ph 4 ASLAV Enhancement LAND 400 Ph 1 Survivability of Ground Forces Land Development Branch LAND 112 PHASE 4 ASLAV ENHANCEMENT • Phase 1 acquired 15 USMC LAVs for trial. • Phase 2 acquired 113 ASLAV to equip 2 Cav Regt. • Phase 3 is acquiring 144 vehicles for 2/14 QMI. • Phase 4 is the proposed fleet enhancement. – Project Aim. This phase will upgrade the fleet of Australian Light Armoured Vehicles (ASLAV). • Improvements. Integration of electronic and mechanical systems including: • Mine protection; • Battlefield management; • Signature management; • Spall liners; • Engine retrofit; and • Ballistic protection. • Status. Pre-1st Pass. Updated CABSUB in progress. • YOD (TBC): 2010/11 – 2012/13 • ISD (TBC): 2012-2014 • DCP Guidance: $200m-250m. • Contact: CAPT Dorian Serfontein (+61 2 6265 4360) Land Development Branch LAND 400 PHASE 1: SURVIVABILITY OF GROUND FORCES • Project Aim. To enhance the survivability of land forces in combat operations through the provision of new warfighting systems. Will incrementally replace the Army’s current combat, combat support and some combat service support systems. • Status. Pre-1st Pass. Options review committee planned for mid-07. Proposed 1st Pass FY08/09. • YOD: 2011/12 – 2013/14 • DCP Guidance: $1 - 1.5 b • Contact: LTCOL Richards (+61 2 6265 4918) and CAPT Adam McIntosh. ? ? ? ? ? ? Land Development Branch Special Operations Section MAJ Colin Blyth & CAPT Joel Deans Separate brief to be provided by MAJ Blyth. Land Development Branch Integration Section LTCOL Martin Griffiths Deputy Director Integration Land 146 Combat Identification Land 75 Battlefield Command Support Systems Land Development Branch LAND 146 - Combat Identification 18 • Project Aim. The project aims to enhance the operational effectiveness of the ADF’s Land Forces whilst also decreasing the risk of fratricide. • Phase 1. - Scope. Acquiring the US Joint Combat Identification Marking Systems (JCIMS) capability for a deployable BG in 1 BDE. - Status. FOC by EOY 06. • Phase 2. - Scope. Proposes extending the Phase 1 capability to the wider Land Force and introducing a specialist BMS for the co-ordination of Close Air Support. - Status. Pre-1st Pass. - YOD: 2007/8 - ISD: 2009-11 - DCP Guidance: $100 - 150m. • Phase 3. - Scope. To acquire the ‘next generation’ CID capability. - Status. Pre-1st Pass. - YOD: 2015/16 - 2017/18 - ISD: 2019-21 - DCP Guidance: $200 - 250m. Contact: SQNLDR Jim Godfrey (+61 2 6265 1101) Land Development Branch 19 LAND 75 Battlefield Command Support Systems • Project Aim - Seeks to: – C2: Increase the accuracy and tempo of C2; – Situational Awareness: Promote Situational Awareness (SA) through providing a Common Operating Picture in an appropriate and timely manner; and – Information Management and Distribution: Improve management and distribution of information within and between tactical headquarters and subordinate units. • LAND 75 provides five key capabilities: – The Battlefield Command Support System (BCSS), or similar; – The Battle Management System; – Define the Land Common Data Environment (LCDE), within the Joint Command Support Environment (JCSE); and – Training products and delivery of these. • YOD: Ph 3.4 07/08 & Ph 4 09/10 • ISD: Ph 3.4 2008-09 & Ph 4 2010-12 • DCP guidance: Ph 3.4 $75 - 100m, and Ph 4 $200 - 250m Land Development Branch Questions 20 | application/vnd.ms-powerpoint | 200 | http://www.defence.gov.au/capability/common/docs/DLCD_Status_Report_LEWG_Jun_06_Master.ppt | au,gov,defence)/capability/common/docs/dlcd_status_report_lewg_jun_06_master.ppt | EWROKHTFFVHBTNBLHWKRYUJ5A6IWLMQM | 2148626 | domains/defence-gov-au/powerpoints/original/au-gov-defence-capability-common-docs-dlcd-status-report-lewg-jun-06-master-ppt-20070908091325.ppt |